We are proud of that
We provide you with the right solution for wastewater treatment.
Together with you we analyze your situation and deliver one to you
coordinated wastewater treatment plant.
Die dargestellten Zahlen sind tagesaktuell. Sie zeigen die gesamte CO2 Menge, die durch unsere Anlagen eingespart wurde. Zudem wird die erzeugte, grüne Energie repräsentiert, die die Anlagen insgesamt produziert haben.
Positive feedback
CO2 savings g / KWh
Current projects
Generated energy KWh
Brewery production wastewater
Development / planning / construction / supervision
Anaerobic treatment in a 40ft HC container
Biogas storage in a 40ft HC container
Treatment capacity (max. 87500 m³ / a): | 62050m³ / a |
Compact container system: | Type FLEXBIO-AF-100 HC |
Place: | Germany; Schönram |
Completion: | 2020 |
Wastewater pollution: | COD: 2000 – 3500 mg / l |
Quality of the purified water: | Indirect introduction
COD:< 600 mg / l |
Biogas production: | 13 m3/h |
Energy production / performance: | approx. 100 kW |
Wastewater treatment delicatessen
Development / planning / construction / supervision
Anaerobic treatment in 3 x 40ft HC containers
Biogas storage in 2 x 40ft HC containers
Treatment capacity: | 65000m³/a |
Compact container system: | Type FLEXBIO-AF-100 HC |
Place: | Germany; Delbruck |
Completion: | 2020 |
Wastewater pollution: | COD: 8000 – 12000 mg / l |
Quality of the purified water: | Indirect introduction
COD:< 2000 mg / l |
Biogas production: | 40 m3/h |
Energy production / performance: | ca. 240 kW |
Sewage / seepage water
processing at biogas plants
Development / planning / construction / supervision
Anaerobic and aerobic treatment in 20ft containers
Treatment capacity: | 4000m³/a |
Compact container system: | Type FLEXBIO-AFBB-010 |
Place: | Germany, Bad Gandersheim |
Completion: | 2016 |
Wastewater pollution: | COD: 1500 – 25000 mg / l
(Total nitrogen): |
Quality of the purified water: | Direct introduction
COD:< 15 mg / l TN (total nitrogen): |
Biogas production: | 5 m3/h |
ReBi 2.0 pilot system
Innovative process for needs-based biogas production
Development / planning / construction / supervision
Hydrolysis and anaerobic fixed bed for biogas production as required
Treatment capacity: | 4000m³ / a |
Place: | Germany, Bad Hersfeld |
Completion: | 2017 |
Biogas production: | 40 m3/h |
Energy generation: | 75 kW el , 130 kW th |
Pilot plant for waste leachate treatment
Development / planning / construction / supervision
Anaerobic and aerobic treatment pilot plants in 40ft containers
Treatment capacity: | 1800m³ / a |
Compact container system: | Type FLEXBIO AFBBM-075 |
Ort: | China; Tianjin |
Fertigstellung: | 2017 |
Wastewater pollution: | COD: 55,000-70,000 mg / l
(Total nitrogen): |
Quality of the purified water: | Indirect introduction
COD:< 100 mg / l TN (total nitrogen): |
Biogas production: | 5 m3/h |
Abwasser-/Sickerwasseraufbereitung an Biogasanlagen
Development / planning / construction / supervision
Anaerobic and aerobic treatment in a 40ft container
Behandlungskapazität: | 6000 m3/a |
Kompakt-Containeranlage: | Type FLEXBIO-AFBB-075-P |
Ort: | Deutschland, Wilstedt |
Fertigstellung: | 2017 |
Verschmutzung des Abwassers: | CBS (organisch): 1000 – 40000 mg/l TN Gesamtstickstoff): 50 – 2000 mg/l
TP (Gesamtphosphor): 10 -300 mg/l |
Qualität des gereinigten Wassers: | Direkteinleitung
CSB (organisch): < 15 mg/l TN (Gesamtstickstoff): < 10 mg/l |
Biogas production: | 10 m3/h |
Please feel free to contact us
Your contact for all questions about wastewater systems and biogas technology.

Karsten Wabnitz
Technical Sales